What matters
Confirm the transport envelope, trailer type, permits and preferred delivery hours. Remove or fold external elements that exceed safe transport dimensions, then reinstall them on site.

Plan before manufacture
The lifting plan must identify unit weight, centre of gravity, certified lifting points, crane capacity and ground conditions. Coastal sand or recently filled ground may need stabilization before crane setup.

Make the decision clearer
Photograph connections before disassembly and label removable parts. A clear record makes future relocation faster and reduces damage to finishes, cables and plumbing.