What matters
Confirm levels, foundations and anchor locations against the final unit drawings. Small dimensional errors can stop the crane operation or leave doors, ramps and service points at the wrong height.

Plan before manufacture
Plan the delivery route from the public road to the final position. Check turning radii, gate widths, overhead cables, tree branches, ground strength and the crane’s safe working area.

Make the decision clearer
Bring electricity, water, drainage and data connections to coordinated termination points. Clear responsibility between site team and unit supplier prevents delays during commissioning.